NASF Solar Pool upgrade
N62473-09-C-2809 Naval Air Station Fallon, NV New structure construction consisted of 3’ diameter by 10’ deep foundations, metal support beams and roof 30’ height, 60’ long x 50’ wide. Installed solar...
View ArticleLake Mead, NV, HVAC (ARRA)
Contract: C836009142A Removed existing units, and designed, furnished and installed residential type Air Conditioner/Heat Pump units and associated equipment, including programmable set back...
View ArticleBomb Assembly Bldg 246
Contract: N62473-10-C-1021 Provided and installed building ceiling and wall insulation, vacuum operated gas-fired low intensity infrared heating system to provide overhead heating over a 10, 000 sq...
View ArticleROC Center Bldg 465
N62473-10-C-1017 Naval Air Station Fallon, NV $228,512.00 Walls renovated for sound proofing to full height and formed main corridor with three new doors into three new spaces. New spaces were...
View ArticleHot Creek and Sage Hen Trail Bridges
Contract: AG-82B1-S-10-0287 Boise National Forest, ID $176,500.00 Bridge removal and replacement. Removed and replaced 2 existing bridges and built 3 new bridges. Helicopters were used to transport...
View ArticleIce Harbor Dam
Ice Harbor Fish Trap Modification MACNAK Construction is just reaching substantial completion of the Design and Build project, Ice Harbor fish Trap Modification, at Ice Harbor Dam. This project was...
View ArticleVA Hospital Renovation Hot Springs
VA Hospital Renovation Hot Springs SD MACNAK Construction was awarded this project in 2012 and is roughly 50% of the way through this project with the VA. The Hot Springs VA Hospital is a Historic...
View ArticleStaircase Rapids Suspension Bridge
Staircase Rapids Suspension Bridge project MACNAK Construction just finished substantial completion on the $1.2Million dollar Design and Build Staircase Rapids Suspension bridge project located in the...
View ArticleElwha River Restoration
Elwha River Water Treatment plant Restoration: MACNAK Construction has been awarded the Elwha River WTP Restoration contract to repair the filtration system which was damaged by dirt and debris...
View ArticleCannon AFB, NM
Cannon AFB 96 Person Dormitory MACNAK Construction is currently completing the 96 Person Dormitory Design and build project at Cannon AFB. This project is on schedule to be complete near the end of...
View Article